The Triangle, Swindon

Pinewood Structures was commissioned by a Major Main Contractor to supply the timber frames for the venture between Kevin McCloud’s development company, Hab, and housing group GreenSquare. The houses were be built to then Code 4 in the Code for Sustainable Homes with several being...

Project in detail

£400k

Timber Frame Value 


42 Homes

Number of units


5 weeks

Time on site
 


The scheme consisted of two and two-and-a-half storey terraces containing 2, 3, and 4-bedroom homes around a central village green. The east and west terraces were both terminated by three-storey corner blocks, each containing three apartments, providing focal points as you enter and leave the scheme.
 

Pinewood Structures provided the timber frame for this scheme and Hemcrete® was used for the walls.

Tradical Hemcrete is a hemp and lime wall thermal walling system that absorbs CO2 in its manufacture and so has negative embodied CO2. For a typical wall section, the material will have 130kg CO2/m2 less than a similar wall built of brick and block construction.

This project used Hemcrete® walls (site cast Lime and hemp mixture) which needed extensive co-ordination between all parties to overcome design and build challenges, plus had a compressed build time of 5 weeks, which was successfully delivered by Pinewood Structures.
 

—— Case Studies

Retirement Living bungalows - Buntingford

The layout of the properties allows access to the main building with its club lounge and facilities...

Paston, Peterborough

Pinewood delivered around 2 units per week for a sustained period, with the frames being...

Oakgrove, Milton Keynes

For this project we supplied our Quantum 17  pre-insulated closed panel system for phase 1 of...